Hydraulic systems fail from contamination far more than from component wear, and contamination is the one thing a maintenance programme can control outright. Oil analysis on a hydraulic system is worth more than on almost any other asset, because the results are actionable long before anything on the machine misbehaves.
ChatterFix builds these as child assets under hydraulic power unit, so failure history and PM completions attach to the component that actually failed — not just to the machine.
The failure modes worth designing a maintenance schedule around — in rough order of what they cost when they happen.
Recording that a PM was "done" tells you nothing next quarter. These are the readings that let you see a failure coming — and the reason ChatterFix captures measurements against the asset rather than just completions.
The parts whose absence turns a short repair into a long outage.
The PMs ChatterFix schedules against this equipment, with intervals and time estimates.
Hydraulic contamination is the leading cause of valve and pump failure on a molding machine. Particles score servo valve spools, which prod…
Forklifts are involved in a large share of serious warehouse injuries, and OSHA requires both daily operator checks and current operator ce…
A rooftop unit spends its life outdoors, and everything that matters about it degrades from exposure: coils foul, belts stretch, dampers se…
ChatterFix builds this asset, its components, and its PM schedule automatically when you pick your industry — then your technicians update it by talking, not typing.