ChatterFixBeta
● SYSTEM ONLINEMAINTENANCEQUALITYSAFETYPRODUCTIONVOICE CAPTUREPREDICTIVE PM● SYSTEM ONLINEMAINTENANCEQUALITYSAFETYPRODUCTIONVOICE CAPTUREPREDICTIVE PM
Voice-First · Built For The Floor

The AI CMMS Built
for the Plant Floor.

Maintenance · Quality · Safety · Production — one login, one set of data, every department talking to each other.

Pick your industry and ChatterFix builds your plant: equipment hierarchy, PM schedules, quality checklists, and safety inspections — automatically.

// NO CREDIT CARD · NO SALES CALL · YOUR DATA STAYS YOURS

Try a live plant — no sign-up

Your own copy of a working vinyl-extrusion plant (Golden Vinyl): equipment, PMs, parts, history and crew. Yours for 7 days, nothing to install, phone code for Fix It Fred included.

We email you the link so you can come back to it.

STEP 01
1

Sign Up

One form. Your own private workspace, instantly.

STEP 02
2

Pick Your Industry

Extrusion? Food & beverage? General manufacturing? We build your lines, equipment, PMs, and checklists for it.

STEP 03
3

Run Your Plant

Import your parts from Excel, upload your manuals, invite the team. The AI has read everything by lunch.

// Two Apps · One Loop

On The Floor. On The Desk.

The technician talks through the job on the phone. The work order, the part and the time land in ChatterFix, in their own words. Here is one repair, start to finish, in three minutes.

Every screen is a real recording of the apps. Sound on.

Fix It Fred AI

On the floor · the technician's app
  • Say what you did; it becomes the work order, the part and the time
  • Troubleshooting that starts from this plant's own history
  • Check out parts with a real shelf count
  • Hot work and other stop-work jobs won't start without the permit
  • Works with ChatterFix, alongside another CMMS, or on its own
See Fix It Fred

ChatterFix

On the desk · the plant's CMMS
  • Work orders, PMs, parts and permits in one place
  • Pick your industry and it builds your equipment, PMs and parts
  • Imports the spreadsheets your plant already has, mess and all
  • Quality, safety and production feed the same work orders
  • Free while it's in beta
Build My Plant — Free
// Planning · Parts · Sign-Offs

Plans Around Your Production. Orders Before You Run Out.

The manager sets the rules once. ChatterFix plans the week around the lines, the crew and the parts, and shows why it put every job where it did.

PLAN

Planner Board

“Plan my week” drafts the week around each line's downtime, the crew's hours and time off, skills, parts and sign-offs. Every job says why it landed there. Nothing changes until you approve, and “What if” re-plans when a shutdown moves or a tech is out.

Draft · Approve · What-If
LINES

Production & Downtime Calendar

Each line's running hours, planned shutdowns, changeovers and holidays. PMs on machines that need the line down are slotted into the next window by themselves.

Downtime Windows
RULES

Scheduling Rules

The manager sets who gets a job: skills, certifications, shift, area and workload. Off, suggest, or assign automatically, technicians first. It never overrides a person you picked.

Off · Suggest · Assign
PARTS

Parts Rules

Reorder point, max, safety stock, lead time, critical spares, preferred and backup vendors. Parts for PMs coming due are counted ahead, small reorders go through under a dollar limit you set, and “What would be ordered now” shows every reorder and why.

Auto-Reorder
JOB PLAN

Job Plan & Sign-Offs

Reserve parts for a job, line up a contractor with their insurance checked, and require a quality or safety sign-off before the job starts or closes. Only the named person or role can sign, and there's a Safety role for it.

Quality · Safety
QUALITY

Quality By Industry + AI

Readings and checks with your industry's limits; one outside them is flagged on the spot. Ask the AI about quality and it answers from your plant's own records.

Grounded Answers
// One Platform · Every Department

Everything A Plant Runs On.

Each module is complete on its own. Together they share one set of assets, parts, people, and history — so nothing gets typed twice and nothing falls between departments.

MOD·01

Maintenance

Work orders, PM scheduling by time or meter, a planner board, parts inventory with checkout and rule-based reordering, asset hierarchy down to the component, full history on every machine.

CMMS Core
MOD·02

Quality

Industry inspection checklists, non-conformance tracking, CAPA — and a rework disposition opens a maintenance work order by itself.

NC / CAPA · ISO 9001
MOD·03

Safety

Incident reporting, recurring LOTO and guarding inspections on the PM engine, PPE and hazard-zone programs per industry. Critical incidents open work orders instantly.

OSHA-Aware
MOD·04

Production

Runs, downtime with reasons, and OEE per line — and a breakdown puts a critical work order on a technician's phone before the line stops spinning.

OEE · Downtime
MOD·05

Fix It Fred

The technician app: native on iPhone, and a web app for Android and every other device. Manuals, parts, work orders and an assistant, with the same live data as the office.

Field AppSee the app →
MOD·06

AI Throughout

Reads your uploaded manuals and schematics, knows each machine's history, searches the web for OEM specs — and drafts the work order for you. One tap to create it.

Manuals · Prints · History
The Departments Intermingle.

A safety incident becomes a work order. A failed inspection becomes a work order. A line breakdown becomes a work order — with the downtime clock already running. That's what one platform actually means.

// Console · Ask Anything

An AI That's Read Every Manual You Own.

Upload your equipment manuals and prints once. From then on, every technician has a 30-year veteran in their pocket.

veteran.ai — LIVE SESSION #4471 · SEALER LINE 3
The sealer is throwing fault E02 — what do I check?
Per Section 2 of your service manual: E02 is seal-bar overtemp — check thermocouple TC-1 and replace if drift exceeds 8°C. LOTO first; the bar runs at 165°C. You replaced TC-1 three weeks ago, so also verify the controller input. manual p.1 · machine history
We don't have the manual for the old Busch pump…
Found it — per buschvacuum.com, the R5 RA 0063 F takes the OEM R-530 oil; change at 500–2,000h depending on duty. Want me to draft the PM schedule? live web sources
TC-1 confirmed bad. Set up the replacement job.
Here's the work order: "Replace TC-1 thermocouple" — high priority, 7-step checklist starting with LOTO, gasket part number included from your manual. created with one tap
// Made For Your Floor

Tailored To Your Industry From Minute One.

Industry packs build your plant the way it actually works — your machines, your PM intervals, your defect types, your downtime reasons. Then everything stays fully editable, and your existing data drops in from Excel or any CMMS export.

🧵 Vinyl / Profile Extrusion 🥫 Food & Beverage 🏭 General Manufacturing 27 ready-made industry packs in all — and yours next

Your Plant Could Be Set Up
Before Your Coffee's Cold.

Free to start. Pick your industry, see your plant, load your parts. That's it.

Build My Plant Now