An extrusion line fails in slow motion. Screw wear, drifting thermocouples, and a fouled calibrator show up as scrap and gels long before anything actually breaks — which is exactly why interval-based PMs matter more here than reactive work.
Look for a system that records measurements, not just completions. Screw clearance and zone temperature are trend data — a CMMS that only stores 'PM done' throws away the signal that predicts the failure.
The equipment that shows up in nearly every an extrusion plant.
Extrusion lines: extruder, die & tooling, calibration, haul-off, cut-off, packing — with the PMs that keep them running. Pick this industry at signup and all of it is created for you — no import, no configuration.
PPE:
Hazard zones:
Pick Vinyl & Profile Extrusion at signup and your plant is standing up in about three minutes — equipment, PMs, quality checklists, and safety inspections included.