Chemical plants run on mechanical integrity. Maintenance is a process safety control, and the documentation requirements around inspection, testing, and management of change are as demanding as the work itself.
Mechanical integrity inspection tracking is the core requirement. The CMMS must be able to prove every piece of covered equipment was inspected on its required interval.
The equipment that shows up in nearly every a chemical plant.
Mechanical integrity of pumps, exchangers, relief devices, agitators and the scrubber. Opening the process is a permit, not a maintenance work order. Pick this industry at signup and all of it is created for you — no import, no configuration.
PPE:
Hazard zones:
Pick Chemical Processing at signup and your plant is standing up in about three minutes — equipment, PMs, quality checklists, and safety inspections included.