The dehumidifier check is the coil, the drain, and the filter, and a cover comes off only with the unit off. The technician writes the as-found reading and compares it with the last one on the asset. Do not change a humidity setpoint from this work order. Anything past that line belongs to the site's own procedure, the OEM manual, or a permit. This is the inspection ChatterFix schedules. It is not itself permission to go further.
The steps ChatterFix schedules for this PM. Every step is a checkable item on the work order — a technician can speak their way through it without touching a keyboard.
The dehumidifier check is the coil, the drain, and the filter, and a cover comes off only with the unit off. The technician writes the as-found reading and compares it with the last one on the asset. Do not change a humidity setpoint from this work order. Anything past that line belongs to the site's own procedure, the OEM manual, or a permit. This is the inspection ChatterFix schedules. It is not itself permission to go further.
The room climbs, the setpoint moves, and the blocked drain is still blocked tomorrow. The round still closes, the number never lands on the asset, and the next person inherits a guess. Do not change a humidity setpoint from this work order.
Every two weeks. A unit that will not hold the room is written up. The setpoint stays. An as-found reading outside the limit the site already published is a finding. It does not become a new setpoint on this work order.