A tablet press is locked out before punches, the feeder, and the force sensor are looked at. Weight, thickness, and speed belong to the released process, not to this inspection.
ChatterFix builds these as child assets under tablet press, so failure history and PM completions attach to the component that actually failed — not just to the machine.
The failure modes worth designing a maintenance schedule around — in rough order of what they cost when they happen.
Recording that a PM was "done" tells you nothing next quarter. These are the readings that let you see a failure coming — and the reason ChatterFix captures measurements against the asset rather than just completions.
The parts whose absence turns a short repair into a long outage.
The PMs ChatterFix schedules against this equipment, with intervals and time estimates.
The CO2 sensor panel check records the reading, the alarm, and whether the sample line is connected. The technician writes the as-found rea…
The feeder switch check confirms the enclosure is closed, locked, and tagged, and reads the handle position the site posted. The technician…
The filling isolator glove and the differential on the site's gauge are the evidence the barrier is intact. The technician writes the as-fo…
The fire suppression panel check records cylinder gauges, panel status, the abort station, and the discharge sign. The technician writes th…
The tonnage signature is the die telling you what is happening inside it. A worn punch, a mis-set shut height or a failing nitrogen cylinde…
The tablet press check looks at punches and the force-sensor reading the released procedure names, with the press locked out. The technicia…
Tyres are one of the largest line items in a fleet budget and a major safety exposure. Underinflation destroys casings from the inside thro…
ChatterFix builds this asset, its components, and its PM schedule automatically when you pick your industry — then your technicians update it by talking, not typing.