Choose your industry and machines. Get a starter preventive maintenance plan with tasks, intervals, labor hours, and the steps to perform each job.
Everything is editable: change any machine, task, interval, hours or step, remove rows, or add your own. Your edits go in the email.
| Machine | Lines | Task | Every (days) | Hours | Steps (one per line) |
|---|
These are starting intervals. Check your OEM manuals and site safety procedures before scheduling work.
Load these PMs into a free ChatterFix accountPreventive maintenance gives your team a chance to find wear, contamination, loose connections, and unsafe conditions before they stop production. A useful schedule names the actual machine, assigns a repeatable task, and gives the technician enough detail to prepare. This builder draws from ChatterFix industry packs. Select only the equipment you have, then review every suggested job with the people who maintain it. The result is a starting conversation for your plant, not a final instruction to perform work.
Start with the machine list. Production line equipment is installed once per line, so the line count changes the monthly labor estimate for those tasks. A chiller, compressor, or other shared support asset is counted once. If your plant has two separate support assets of the same kind, add that detail when you move the plan into your maintenance system. The estimate is a planning number: it divides the listed task hours by the interval and expresses the average over a 30 day month. It does not include travel, permits, shutdown coordination, spare parts, or unexpected repairs.
Read “Every 2 weeks” or “Every 6 months” as a calendar trigger. Some jobs also show “or every 15,000 miles” or another meter trigger. For those jobs, perform the work when either trigger arrives first. Record meter readings reliably; otherwise the calendar fallback is the only dependable trigger. Avoid pushing a meter based job out just because the calendar date is still far away. For equipment with unusually heavy use, harsh conditions, or repeated failures, inspect the interval with your reliability and operations teams.
Open the steps column to see the suggested procedure for each task. These steps help with planning and work order drafting, but they are not a replacement for your OEM manuals, lockout procedures, local rules, or qualified technical judgment. Check the correct lubrication grade, torque value, inspection limit, and isolation method for your specific model. Assign crafts and spare parts before releasing a work order. Train anyone doing a safety critical check, and have the site's safety owner review plant wide rows.
Once the first cycle is complete, compare planned hours with actual labor and note findings on each work order. If inspections never reveal a problem, consider whether the task or interval is useful; if failures still occur between visits, investigate the failure mode before simply shortening every interval. Keep a history of readings, observations, parts used, and follow up work. That record turns a starter schedule into a plan shaped by your own equipment and operating conditions.
Pick your industry and ChatterFix builds the equipment hierarchy, PM schedules, quality checklists, and safety inspections to match — in about three minutes.