| Field | Why it matters |
|---|---|
| Title | The problem in a few words, with the machine: "Puller belts slipping — Line 2" |
| Machine (asset) | Builds the machine's history, failure counts and costs |
| Priority | Critical = line down or safety; High = today; Medium = this week; Low = when there's time |
| Type | Corrective, Preventive, Emergency, Inspection or Installation, for your reports |
| Description | What you saw, heard or measured: alarms, readings, when it started |
| Assigned to | One owner. Helpers can be added |
| Due date | When it really has to be done |
| Photos | A picture of the leak, the gauge or the nameplate saves a walk |
Next: best practices