Like what you see? Get your own AI-powered CMMS dashboard with real data.
Get Your Free Audit
Overview Analytics Manager KPIs Scheduling Equipment Health
156
Work Orders (30d)
12% vs last month
92.5%
PM Compliance
3.2% improvement
2.4h
Avg MTTR
18min faster
$24.7K
Monthly Cost
$2.1K saved
Recent Alerts
Compressor C-5 pressure warning
22 minutes ago • Critical
Low stock: Water Pump Seals (8 remaining)
35 minutes ago • Medium
WO-1156 completed by Mike Rodriguez
15 minutes ago • Normal
PM scheduled for Backup Generator
1 hour ago • Normal
AI Insights
Predictive Alert
HVAC Unit B-2 filter efficiency dropping. Schedule replacement within 5 days to avoid airflow issues.
Cost Optimization
Grouping 3 pending preventive tasks on Production Line A could save $850 in labor costs.
Team Performance
Sarah Chen achieved 98% completion rate this month. Consider her for Lead Tech promotion.
Work Orders by Month
Reactive vs Preventive
Maintenance Cost Trend
Work Order Completion Trend
Mean Time to Repair
On Target
2.4 hrs
Target: 3.0 hrs
Improved 18min from last month
Mean Time Between Failures
On Target
168.5 hrs
Target: 150 hrs
Stable trend
PM Compliance Rate
Exceeding
92.5%
Target: 90%
+3.2% vs last month
WO Completion Rate
Near Target
89.7%
Target: 92%
+1.5% improvement
Asset Utilization
On Target
87.3%
Target: 85%
+2.1% vs last month
Training Compliance
On Target
88.0%
Target: 85%
22 of 25 modules completed
Technician Scorecards
Technician Role Completion Rate Avg Response Efficiency Rating Status
Sarah Chen Lead Technician 98% 8 min 96 4.9 Active
Mike Rodriguez Senior Technician 94% 12 min 92 4.8 Active
Maria Garcia Senior Technician 91% 11 min 89 4.7 Active
James Wilson Technician 87% 15 min 85 4.6 Training
Weekly Maintenance Schedule
Preventive Corrective Emergency Inspection
Mon
Tue
Wed
Thu
Fri
Sat
Sun
7 AM
HVAC Filter PM
Safety Walkthrough
Generator PM
8 AM
Pump Seal Replace
Belt Inspection
Equipment Audit
9 AM
Meter Readings
Motor Rewinding
Lubrication Route
10 AM
Compressor Repair
Vibration Analysis
11 AM
Conveyor PM
Valve Replace
Thermal Imaging
1 PM
Electrical PM
Chiller Service
2 PM
PLC Reprogram
Fire Sys Check
Pipe Leak Fix
Upcoming Work Orders
WO # Title Asset Priority Assigned To Due Status
WO-2024-001 Replace HVAC filters HVAC Unit B-2 High Mike Johnson Tomorrow In Progress
WO-2024-002 Compressor oil change Compressor C-5 Critical Sarah Chen Overdue 3d Overdue
WO-2024-003 Production line calibration Production Line A Medium Alex Rodriguez In 14 days Scheduled
WO-2024-004 Conveyor belt tension adjust Conveyor Belt C-2 Low Maria Garcia In 21 days Scheduled
21
Operational
2
Maintenance Required
1
Down
87.3%
Avg Utilization
Asset Health Monitor
Asset Type Health Score Status Uptime Risk Score Next PM Prediction
Production Line A Manufacturing
85%
Operational 99.2% Low Dec 15 Belt wear in ~12 days
HVAC Unit B-2 HVAC System
72%
Needs Attention 95.5% Medium Dec 8 Filter clog in ~5 days
Backup Generator Generator
96%
Excellent 100% Low Jan 20 No issues predicted
Compressor C-5 Compressed Air
35%
Down 78.3% Critical Overdue Failure imminent (2d)
Forklift FL-001 Material Handling
90%
Operational 98.7% Low Mar 1 Battery degrading (~18d)
Conveyor Belt C-2 Material Handling
82%
Operational 97.1% Low Jan 10 No issues predicted